Key Messages

  • All countries included in the country tracker are working on one or more of the eight practical steps.
  • Most progress has been seen in establishing baselines, conducting situation analyses and developing standards, whereas integration of WASH indicators and infrastructure improvements remain the biggest gaps.
  • Country efforts are focused on policy-level initiatives and still lack sufficient funding and investment to improve infrastructure and address large gaps in service.
  • Progress is happening even in fragile and conflict settings.

Tracking Progress

The country tracker (below) provides the basis for updates to the World Health Assembly on progress against the Resolution (2021 and 2023) and will be used for reporting to the United Nations General Assembly on the 2023 Resolution (due in 2025). All countries are invited to submit progress.

The tracker presents a snapshot of progress from 73 countries (as of April 2023). The target for 2025 is 100 countries.

To submit a country progress update to be included in the tracker, please use this form (Microsoft Forms).

Legend

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed

A need has been identified to and/or plans are in place to start

No progress made and/or no plans in place to start

No data

Linked resources

Progress Tracker

Total Countries - 107
Filter
COUNTRIES & REGIONS SITUATIONAL ANALYSIS BASELINE ASSESSMENT OR DATA NATIONAL COORDINATION ROADMAP & TARGETS WASH IN HEALTH CARE FACILITIES STANDARD HEALTH CARE WASTE MANAGEMENT STANDARD INFRASTRUCTURE IMPROVEMENTS WASH INDICATORS IN NATIONAL MONITORING WORKFORCE DEVELOPMENT
Afghanistan No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start
Algeria No data No data Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Angola A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start No data No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing No progress made and/or no plans in place to start No data A need has been identified to and/or plans are in place to start
Armenia Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Bahrain No data Practical step underway or partially completed Practical step underway or partially completed No data Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Bangladesh Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed

Practical step underway or partially completed

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed

Practical step underway or partially completed

Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Belize A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start
Benin A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start
Bhutan Practical step underway or partially completed

Practical step underway or partially completed

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Bolivia (Plurinational State of) No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing No data Practical step underway or partially completed Practical step underway or partially completed No data
Brazil Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No data No data Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start
Brunei Darussalem A need has been identified to and/or plans are in place to start No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing No data No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing No data No data
Burkina Faso A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Burundi A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start Practical step underway or partially completed
Cambodia Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed

Practical step underway or partially completed

A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Cameroon Practical step underway or partially completed

Practical step underway or partially completed

Practical step underway or partially completed

Practical step underway or partially completed

No progress made and/or no plans in place to start No progress made and/or no plans in place to start No data No data A need has been identified to and/or plans are in place to start No data No data
Central African Republic No progress made and/or no plans in place to start No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start
Chad No progress made and/or no plans in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start No data No progress made and/or no plans in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start
Colombia A need has been identified to and/or plans are in place to start Practical step underway or partially completed No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed A need has been identified to and/or plans are in place to start No data
Cote d’Ivoire Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed

Practical step underway or partially completed

A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Democratic Republic of Congo A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing No data Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed
Djibouti A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start
Dominican Republic A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start
DPR Korea Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed
Ecuador Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Egypt A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Equatorial Guinea Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start
Eswatini A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Ethiopia Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Fiji A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Gabon No data A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start No data Practical step underway or partially completed
Gambia (Republic of The) A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Georgia Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Ghana Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start
Guatemala A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing No progress made and/or no plans in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing No progress made and/or no plans in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start
Guinea A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Guinea Bissau Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start
Honduras No data Practical step underway or partially completed No progress made and/or no plans in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start
Hungary Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing
India No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Indonesia Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed

Practical step underway or partially completed

Iran (Islamic Republic of) Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Iraq Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Jamaica Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed
Jordan Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start
Kazakhstan No data Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing No progress made and/or no plans in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start
Kenya Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start

A need has been identified to and/or plans are in place to start

Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Kuwait Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Kyrgyzstan A need has been identified to and/or plans are in place to start Practical step underway or partially completed No data No data A need has been identified to and/or plans are in place to start Practical step underway or partially completed No progress made and/or no plans in place to start No progress made and/or no plans in place to start Practical step underway or partially completed
Lao People’s Democratic Republic Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed
Lebanon Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Lesotho A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start
Liberia Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed

Practical step underway or partially completed

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed
Libya A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Lithuania No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing No data No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Madagascar Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed
Malawi A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed

Practical step underway or partially completed

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed

Practical step underway or partially completed

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed
Malaysia Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Maldives Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Mali Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Micronesia (Federated States of) No progress made and/or no plans in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start No progress made and/or no plans in place to start Practical step underway or partially completed No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start
Mongolia No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Montenegro Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start
Morocco Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Mozambique A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Myanmar Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed No progress made and/or no plans in place to start Practical step underway or partially completed No progress made and/or no plans in place to start
Namibia A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed
Nepal A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Nicaragua No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Niger Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed

Practical step underway or partially completed

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Nigeria No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed

Practical step underway or partially completed

A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Occupied Palestinian territory A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Oman Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Pakistan Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Palau Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed
Panama A need has been identified to and/or plans are in place to start

A need has been identified to and/or plans are in place to start

Practical step underway or partially completed No progress made and/or no plans in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed No progress made and/or no plans in place to start No progress made and/or no plans in place to start No data
Papua New Guinea Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed
Paraguay No progress made and/or no plans in place to start Practical step underway or partially completed No progress made and/or no plans in place to start No progress made and/or no plans in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start Practical step underway or partially completed
Peru A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Philippines Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Qatar Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Rwanda Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed

Practical step underway or partially completed

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed

Practical step underway or partially completed

Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Samoa No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Sao Tome et Principe No data Practical step underway or partially completed A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No data A need has been identified to and/or plans are in place to start
Senegal A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start No data No data A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed
Serbia Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed

Practical step underway or partially completed

Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed
Sierra Leone No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No data
Somalia Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed
South Sudan A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing No data No data No data
Sri Lanka No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed

Practical step underway or partially completed

Sudan Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

No data No progress made and/or no plans in place to start Practical step underway or partially completed
Syrian Arab Republic Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Tajikistan Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Tanzania Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start
Thailand Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Timor-Leste Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing
Togo Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed
Tonga A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Tunisia Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Uganda Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed A need has been identified to and/or plans are in place to start

A need has been identified to and/or plans are in place to start

Practical step underway or partially completed

Practical step underway or partially completed

Ukraine Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed

Practical step underway or partially completed

Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
United Arab Emirates Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed No data Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed
Vanuatu Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step underway or partially completed

Practical step underway or partially completed

Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start
Viet Nam A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed
Yemen A need has been identified to and/or plans are in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start No progress made and/or no plans in place to start Practical step underway or partially completed A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start
Zambia A need has been identified to and/or plans are in place to start A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing A need has been identified to and/or plans are in place to start Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step completed or achieved on a national level and/or large-scale implementation ongoing

Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed

Practical step underway or partially completed

Zimbabwe Practical step underway or partially completed Practical step completed or achieved on a national level and/or large-scale implementation ongoing Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed Practical step underway or partially completed No progress made and/or no plans in place to start A need has been identified to and/or plans are in place to start